This journey is in zones 1&2 and you’ll have to use the DLR and Jubilee lines, changing trains at Canary Wharf
- From Island Gardens take the Docklands Light Railway
- Change at Canary Wharf to the Jubilee Line
- Leave the train at Southwark
Number of stops: 9 · Journey time: Approx 29 mins
Stations on the route: Island Gardens ➜ Mudchute ➜ Crossharbour & London Arena ➜ South Quay ➜ Heron Quays ➜ Canary Wharf (DLR) [change train] Canary Wharf (Underground) ➜ Canada Water ➜ Bermondsey ➜ London Bridge ➜ Southwark
Live status and delays
Closures on the DLR and Jubilee line
First and last train times
Docklands Light Railway timetable
Alternative routes include Island Gardens to Waterloo, Island Gardens to Borough and Island Gardens to Blackfriars
Stairs, lifts and escalators
Island Gardens is wheelchair accessible, and has step-free access from the street to the train
Southwark is wheelchair accessible, and has step-free access from the street to the train
Island Gardens entrance – There’s a lift between the entrance and the platforms. If you want to avoid the lift then you can use five flights of stairs (12 steps down +8 steps down +3x12 steps down)
Changing trains at Canary Wharf – You must use an escalator, a lift, and walk 200 metres outside to change between the DLR and Jubilee platforms
Southwark exit – There’s a lift from the platforms to the booking hall (or two escalators, or one flight of 14 stairs), plus another lift to the exit (or two flights of 15 and 7 stairs)
This journey is in zones 1&2 and you’ll have to use the Jubilee and DLR lines, changing trains at Canary Wharf
- From Southwark take the Jubilee Line
- Change at Canary Wharf to the Docklands Light Railway
- Leave the train at Island Gardens
Number of stops: 9 · Journey time: Approx 29 mins
Stations on the route: Southwark ➜ London Bridge ➜ Bermondsey ➜ Canada Water ➜ Canary Wharf (Underground) [change train] Canary Wharf (DLR) ➜ Heron Quays ➜ South Quay ➜ Crossharbour & London Arena ➜ Mudchute ➜ Island Gardens
Live status and delays
Closures on the Jubilee and DLR line
First and last train times
Jubilee line timetable
Alternative routes include Southwark to Waterloo, Southwark to Borough and Southwark to Blackfriars
Stairs, lifts and escalators
Southwark is wheelchair accessible, and has step-free access from the street to the train
Island Gardens is wheelchair accessible, and has step-free access from the street to the train
Southwark entrance – There’s a lift between the entrance and the booking hall (or two flights of 15 and 7 stairs), plus another lift to the platforms (or two escalators, or one flight of 14 stairs)
Changing trains at Canary Wharf – You must use an escalator, a lift, and walk 200 metres outside to change between the DLR and Jubilee platforms
Island Gardens exit – There’s a lift between the platforms and the exit. If you want to avoid the lift then you can use five flights of stairs (3x12 steps up +8 steps up +12 steps up)
Cash, Oyster & Travelcard fares
The journey is in zones 1-2. The cheapest fare is £2.80 off-peak (£3.40 peak) when you pay by Oyster or contactless. There are no return tickets, you just pay the same as two singles
Fare zone | Cash | Oyster & Contactless cards | |||
---|---|---|---|---|---|
Single fare | Single fare | Daily cap | |||
Peak | Off-peak | Peak | Off-peak | ||
Zone 1-2 fare | £6.70 | £3.40 | £2.80 | £8.50 | £8.50 |
Fare Zone | Travelcards (Train, Bus & Tram) | |||
---|---|---|---|---|
One day travelcard | Week travelcard | Month travelcard | ||
Anytime | Off-peak | |||
Zone 1-2 travelcard | n/a | n/a | £42.70 | £164 |
Zone 1-4 travelcard | £15.90 | n/a | £61.40 | £235.80 |
Zone 1-6 travelcard | £22.60 | £15.90 | £78 | £299 |
Zone 1-9 travelcard | £28.50 | £17 | £111.30 | £427.40 |
Note: Ticket prices are correct as of |
Peak and off-peak times
For Oyster and contactless off-peak is outside the hours of 6.30 AM-9.30 AM and 4 PM-7 PM (Mon-Fri). For travelcards it’s any time after 9.30 AM (Mon-Fri). Weekends are always classed as off-peak.
The fare is based on what time your journey begins. It doesn’t matter when it ends.